tororo

Projects

Community Capacity Building / Solar and Tree Planting

[caption id=“attachment_418” align=“alignright” width=“150”]Training Tree Planting[/caption] Introduction Forests and woodlands are estimated to have covered about 10,800,000 ha (45%) of Uganda’s surface area in around 1890. Since then the size of the forest estate has drastically shrunk. Over the years the forests have been gradually cleared and today estimates indicate reduction to about 730,000 ha which is only (3%) of Uganda’s area Access to electricity in Uganda is limited for most of the population.

Projects

Lighting Africa powered by "Energi Nord"

Access to electricity inUganda is limited for most of the population. The Ugandan census of 2002 reported that 7.7% of households used electricity for lighting (37% of urban households and 2.6% of rural households) this was up from 5.6% in 1991. In contrast, 74.8% of households (33.3% of urban and 88.2% of rural) were using “tadooba”, a form of paraffin candle, for lighting Fuel-based lighting is a costly and inefficient lighting option, and often consuming between 10 to15 per cent of annual income, forcing the poorest families to divert essential funds away from other critical needs such as children’s education, family health care and nutrition.